Work done: | Electrical installation, IT and Security technology |
---|---|
Customer: | W&W Baugesellschaft |
Architect: | Acers |
Engineering company: | Nutz GmbH |
Area: | 4,500 m² |
Construction costs: | € 1,000,000 |





Details
Work done
Dismantling of existing electrical equipment Installation of the following specifications:
- Extension Siedle intercom
- area wide instrusion alarm system for entire building area of GSK
- instrusion alarm system for GSK
- Access control for GSK and the entire building
- electrical removal including lighting
- IT infrastructure secondary and tertiary
- Complete wiring including complete fire protection measures
- Extension building control systems & automation technology
Particulars / Special features
Completion of the job, from planning to hand over, took place in a very narrow timeframe of 3 months. Additionally all systems were installed during the continued normal operation of the remaining 8,000 m2 of space in the Altezza building.