OTC – Munich

Work done: Elektroinstallation, Datentechnik und Sicherheitstechnik
Customer: EUBAG Operation GmbH
Architect: S+W Architekten
Engineering company: Line Consult / Nutz GmbH
Area: 1.200 m²
Construction costs: 280.000 €

Details

Work done

  • Electrical engineering
  • lighting equipment
  • IT network
  • optical fiber Backbone
  • access control system
  • Alarm
  • Fire alarm system

Particulars / Special features

Conversion of the existing office space into a showroom. Due to the limited power supply of the office area, a freely configurable load shutdown was installed for the customer.
The operation of the alarm system / access control system was incorporated via a common Mifare-Desfire card.
The server for the access control system was installed in the main office so that further (branch) offices can be managed in the future.